The Light Office Project Ready for Kick-Off, in the Polytechnic Area

These days, the builders are digging the foundation for The Light, a new office project in Bucharest, located in the Politehnica-Orhideea area, on the former Pumac platform, according to the ESOP | Corfac International monitoring team. The project will have high visibility, being located on Iuliu Maniu Boulevard, at the end of Cotroceni Palace, between the Politehnica metro station and the entrance of the Polytechnic University of Bucharest.

The Light will be an 11-story tall building with a timeless design, large glazed spaces, which allow optimal natural lighting of office spaces. The Light will have a total leasable office space of 20,000 sqm, according to BOMA standards.

The Light office building is scheduled to be delivered in the last quarter of next year, 2018.

As facilities, the office project The Light Bucharest will have underground parking, reception, a sky bar, and office spaces will have green building attributes, with great care about reducing energy consumption. The rectangular shape of the office spaces located on each floor will allow the maximum efficiency of their partitioning.

With this project’s appearance, the number of vacant lands in the area adjacent to the Polytechnic University of Bucharest is further reduced, and the bar of real estate projects here is raised once again. Near the Polytechnic University of Bucharest, on Iuliu Maniu Boulevard, apart from these two large office projects, modern residential complexes, intended for young people, are under construction also.

The Light is 400 meters from Politehnica Metro Station and a 5-minute walk from the Botanical Garden and Cotroceni Palace. Still, it also has an excellent connection to the Victoriei area – thanks to Basarab Passage.

“The main advantage remains the proximity to the Polytechnic University of Bucharest, the largest technical education institution in Romania, where companies that will rent space in The Light offices will quickly absorb the future, skilled workforce,” according to Alexandru Petrescu, ESOP Manager.

The area is part of the new business pole Orhideea-Grozăvești-Politehnică, in the center-west area of ​​the Capital, where state-of-the-art office buildings are being built, such as those in The Bridge, AFI Park, Orhideea Towers, Campus 6 and Business Gardens projects.

If you want office space in the Light building, you can find information on our website, and you will benefit from free space planing and 0% commission. Click on the link The Light.


Maria Neda

PR & Media Coordinator, PR & Media Consultant, with background as a journalist in the economic press and experience as a consultant in Urban Development.

Postari similare

The second office building in the U Center project is close to completion


The second office building in the U Center business park is under construction and will be completed in the second half of this year. It has a basement layout for parking, a ground floor, and eight floors for office space for rent, with large, open areas on each floor. The name of the U Center […]


Read more

ONE Cotroceni Park Phase 2, the First Office Building Delivered in 2023


The first month of the year also brought the first delivery of an office building, namely the second building of the ONE Cotroceni Park project, the only building to be completed in 2023 in the Central-Western area. ONE Cotroceni is a complete reconversion project of an industrial platform, the former Ventilatorul factory. Developed on a […]


Read more

Which Office Buildings Will Be Delivered in Bucharest in 2023


For the year 2023, the delivery of only approx. 153,000 square meters of high-class office space. The pace of construction of office buildings has slowed down significantly in Bucharest in recent years, and 2022 was the first year in which this was visible. Some of the scheduled multiphase projects have postponed the development of the […]


Read more