Day Tower, Almost Fully Leased Until Reaching the Fourth Floor in Construction

The maximum visibility, with an ultra-central location, in the Unirii area, near the Bucharest Tribunal and the National Library of Romania, brought the success for the Day Tower office project, Day Group developer, under construction, but with only a few spaces left for rent.

Work on site progresses rapidly; according to the ESOP Corfac International monitoring team, the Day Tower office building will be put into use early next year.

Day Tower will eventually have nine floors above ground and two underground levels, with a built area of ​​18,000 square meters, class A office spaces and retail on the ground floor.

The area where the Day Tower is located is also in full a transformation process, for the better, with more and more cultural and leisure attractions appearing, especially for young people, who can also serve the employees of the office buildings in the area.

The National Library building was recently completed and became a point of interest for more and more young people. It was attracted by the cultural projects organized here. On the shore of the Dâmbovița River, five minutes walk from Day Tower. It was put into use this month Wahaka Street Food Park, the first permanent street food park in Romania.

At Wahaka Street Food Park, there are 20 houses, with varied food – from seafood, fish, ribs, burgers, and Argentine beef, to desserts and drinks, adapted to each season. The facilities of the Unirii area are multiplying rapidly, not only in part towards the Old Center but also towards the East.

If you would like more information about the office spaces for rent in Bucharest, please contact the ESOP team by filling this brief form, or by phone (+4) 0723.26.61.97 or (+4) 021.528.04.40. We’ll promptly answer your inquiry!


Maria Neda

PR & Media Coordinator, PR & Media Consultant, with background as a journalist in the economic press and experience as a consultant in Urban Development.

Postari similare

Which Office Buildings Will Be Delivered in Bucharest in 2023


For the year 2023, the delivery of only approx. 153,000 square meters of high-class office space. The pace of construction of office buildings has slowed down significantly in Bucharest in recent years, and 2022 was the first year in which this was visible. Some of the scheduled multiphase projects have postponed the development of the […]


Read more

What Office Buildings Will Be Put into Use in 2022 and Where


In 2022, most office spaces will be put into use in the Cotroceni – Răzoare – Grozăvești areas. “In total, in 2022, we estimate that a total area of ​​162,087 sqm of class A office space will be delivered. Approx. 59% of these spaces will be delivered in the Center-West area of ​​the capital (94,723 […]


Read more

What Office Buildings Will be put into Use in 2021


With an area of 171,341 sqm, nine office buildings have space deliveries scheduled for the next year in Bucharest. All have construction works on time, and five of them have pre-leased spaces that reach approximately 60,000 sqm. As a novelty, more of the buildings have outdoor terraces, more generous than in the past. Furthermore, these […]


Read more