Campus 6 – Phase 1 Has Only 20% Vacant Spaces

The first office building in the Campus 6 project is almost rented. In this phase, Campus 6.1 provides the delivery of about 22,000 sqm of class A office space in the third quarter of 2018. Still, almost 80% of the area is already pre-leased by future tenants, according to our company’s monitoring.

For the 20% of the spaces left in this first building, discussions are held with several potential customers, with the very high probability that the building will be fully pre-rented in the next period. Most of the future tenants are from the IT&C and BPO fields, one of the pre-lease contracts being made through ESOP.

Campus 6 is located at the intersection of Iuliu Maniu Boulevard with Vasile Milea Boulevard, near the Polytechnic University of Bucharest, and very close to the AFI Cotroceni shopping center and the Cotroceni Palace.

The first building on Campus 6, with 11 floors, is in an advanced stage of work, as can be seen from the pictures. It will be joined by two more office buildings, which will benefit from many facilities: amphitheater, common areas with Wi-Fi coverage, rooftop running track.

The developer of the project brings for the first time in Romania the concept of WELL Building Standard, having green building characteristics, being pre-certified to LEED certification standards at Gold level, and numerous other facilities for the campus 6 office building employees.

Finally, in 2021, the Campus 6 office building will have about 82,000 square meters of workspace and 1,000 underground parking spaces.

The center-west area, where the Campus 6 office project is located, is shaping up to be the second-largest office hub in Bucharest, in terms of size and the main IT&C and BPO business HUB in the Capital.

The most crucial factor of the accelerated development of the office market in this area of ​​Bucharest is the high demand for employees with technical training and knowledge of foreign languages, from companies in the fields of IT&C and BPO, for which it is a great advantage to be closer to the Polytechnic University of Bucharest, the largest with this profile in the country and the Grozăvești student campus.

More details about the spaces available in the first building of the Campus 6 project can be found on the offer page on our website:

CAMPUS 6 – phase I – Offices for rent in Grozavesti business center, Bucharest

The following buildings in the office complex will have deadlines as follows:

CAMPUS 6 – phase II – Office spaces for rent Grozăvești – completion in 2020;

CAMPUS 6 – phase III – Office spaces for rent Grozăvești – completion in 2021;

CAMPUS 6 – phase IV – Office spaces for rent Grozăvești – completion in 2022.

If you would like more information about the office spaces for rent in Campus 6, please contact the ESOP team by filling this brief form, or by phone (+4) 0723.26.61.97 or (+4) 021.528.04.40. We’ll promptly answer your inquiry!


Maria Neda

PR & Media Coordinator, PR & Media Consultant, with background as a journalist in the economic press and experience as a consultant in Urban Development.



0% Tenant fee!
Thumb
500 - 22.232 sqm

Campus 6 Bucharest

Grozavesti, Bucharest
  • 14,90€/sqm, negotiable
0% Tenant fee!
Thumb
1.068 - 18.024 sqm

City Rose Park

Presei Libere, Bucharest
  • Price on request!
0% Tenant fee!
Thumb
467 - 3.000 sqm

The Bridge Bucharest

Grozavesti, Bucharest
  • 16€/sqm, negotiable

Postari similare

CityZen: Urban Regeneration of an Emblematic Industrial Facility in Bucharest


In the era where urban development and corporate needs intersect, old building conversion projects are becoming more and more popular. One such example is the CityZen project in Bucharest, which transforms a former factory into a multifunctional complex. CityZen will be developed on a 9-hectare plot, representing a portion of the former Griro factory on […]


Read more

ARC Project: A New Class-A Office Building in the Business Pole of the Center-West Area


In the Orhideelor ​​- Grozavesti area, the ARC project is underway, a building that will bring to the market 30,000 square meters of class-A office space, and a series of advantages for companies that wish to open or expand their headquarters in Bucharest. ARC Project is located next to Business Garden Bucharest, Brico Depot, and […]


Read more

AFI LOFT – A New Office Project Under Development, through the Expansion of AFI Cotroceni Mall


AFI Europe, one of the largest real estate developers in Romania, has started the construction of the AFI Loft project – a new office development of 15,500 sqm, which will be integrated into the AFI Palace Cotroceni mall. The mall has developed a real anchor for what over time has become a particularly important and […]


Read more