WDP Industrial Park Corbii Mari

Industrial Space Rental Corbii Mari, Dambovița ( ID: 14860 )


Details WDP Industrial Park Corbii Mari

The concept:
WDP Industrial Park Corbii Mari is developed on a plot of over 22ha and will have 120,000sqm for rent. Currently are available three warehouses with surfaces between 12,600sqm and 58,700sqm.

Location and accessibility:
WDP Corbii Mari is located on the A1 highway, at km 49, at the exit to Corbii Mari, the access being made from A1 through DJ711A and then on DC46.

Specifications:
Free height 10m, floor resistance 5t/sqm, sprinkler system, fire prevention and extinguishing system, truck access platform.


Facilities

  • Acces Autostrada

Map


Contact form

Interested about the offer?
0% Tenant fee!

or Call

Industrial spaces in WDP Industrial Park Corbii Mari

0% Tenant fee!
Thumb
2.000 - 58.700
  • 4,25€/sqm, negotiable
0% Tenant fee!
Thumb
3.000 - 24.750
  • 4,25€/sqm, negotiable
0% Tenant fee!
Thumb
3.000 - 12.650
  • 4,25€/sqm, negotiable
0% Tenant fee!
Thumb
2.000 - 58.700
  • 4,25€/sqm, negotiable
0% Tenant fee!
Thumb
3.000 - 24.750
  • 4,25€/sqm, negotiable
0% Tenant fee!
Thumb
3.000 - 12.650
  • 4,25€/sqm, negotiable

Frequently asked questions

How can I benefit from 0% real estate brokerage commission from ESOP for WDP Industrial Park Corbii Mari?

All tenants who request ESOP services and are looking for an industrial unit for rent in WDP Industrial Park Corbii Mari benefit from a 0% real estate brokerage commission.

How much does it cost and what does the maintenance fee include?

The maintenance fee in open book system is between 0.5 and 0.95 euro / sqm and includes all maintenance and repair services, building insurance and property tax. The utilities metered separately for the rented space are paid separately

What does an open book maintenance fee reconciliation system mean?

At the beginning of each calendar year, all expenses for the services included in the maintenance fee are checked and if they were higher than the monthly fee, the difference will be paid and if they were lower then they will be compensated with future payments.